Product Details

Electric vegetable cutter machine slicer

Place of Origin Shandong, China (Mainland)
Brand Name LD
Certification ISO 9001, CE Certificate
Model Number Electric vegetable cutter machine slicer
Min.Order Quantity 1 Set
Price US $10,000 - 20,000/ Set
Packaging Details Standard Export Woodencase Suitable for Ocean Carriage
Delivery Time Within 15 or 45 working days after receiveing the deposit
Payment Terms 30% as deposit in advance,70% should be paid before shipment.
Supply Ability 100 Set/Sets per Month

Product Features

Electric vegetable cutter machine slicer

Product Description

Introduction:

All stainless steel cutting machine cut Celery / garlic bolt chopping machine household cutting machine is a conveyor belt, compact and exquisite, novel structure, design of conveyor belt, can cut green onions, celery, coriander, green beans, Japanese cucumber, pepper, sausage and so on, the machine with adjustable speed, the speed of the conveyor belt, when conveying with fast, cut out of the material on the conveyor belt is long, slow, cut out of the material to be short. By adjusting the conveyor belt, it can cut section, cut silk and cut up. For example, spring onion, green onion, pepper (Capsicum ring) and so on. The machine is simple in operation, convenient in cleaning, stable in performance and safe and reliable.

Suitable for food and beverage industry, unit enterprise canteen, food processing plant and other units to use.

Technical Parameter:

Model: HL-Q80

Voltage: 220V/380V

Power: 0.375KW

Weight: 20KG

Size: 500x350x520mm

Output: 50-100KG/H

Detailed Images

Packaging & Shipping

Packing: inside plastic bag, outside wooden case for poultry feed pellet making machine (Based on the customers' need adopt the wooden case or wooden pellets, etc.).

Transportation: shipping, train, express or upon clients' demands.

Our Services
  • With all the technical advantages,we promise customer one year warranty.
  • Low price spare parts provide beyond warranty period.
  • zhengzhou hongle is your best partners!

1. Installation and Debugging: Within the time of warranties, the seller will send the engineer to guide to install the machine, the buyer should prepare the materials needed and should be responsible for the engineer’s safety, travel expense, accommodation abroad. And shall pay the salary for the engineer,150 dollars per day, and if the installation would exceed one month, then the buyer shall pay the engineer 200 dollars per day for the exceeding time. And the seller will provide the Instruction Manual and the Foundation Drawings.

2. The quality assurance date is one year (exclude the quick wear parts) after commissioning, but not exceed 15 months from date on which machine leaves the factory.

3. If the equipment appear the equipment failure because of improper handling

of user, we are in charge of maintenance, and collect the appropriate cost.

4. We offer the components with favorable price, perdurable maintenance.

After quality assurance date, if the equipment needs to be repaired, we only collect the cost price

Company Information

Zhengzhou hongle Machinery Equipment Co., Ltd has been designing, developing, manufacturing and marketing Machinery for more than 12 years.After these years of development, we have high quality professional teams, skillful talents, strong technical force, strong and independent research and development capabilities, advanced production equipment and a perfect aftersales service system. So choose us, equaling to choose the competitive price and stable quality both.

FAQ

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.

3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

Contact me

All Products Contact Now